PPS Doubles Down on Efficiency: Second 730 Street Trencher Joins the Fleet

Street works street trencher asphalt cutter

Headquartered in New Windsor, New York, Precision Pipeline Solutions (PPS) has long been a leader in utility construction and maintenance, serving both gas and electric utilities with a strong focus on safety, innovation, and operational excellence. From pipeline inspection and maintenance to construction, meter exchange, and rehabilitation, their comprehensive service suite stands out in the industry.

In 2024, PPS took a major step by investing in a TCi 730 Street Trencher from Street Works; an acquisition that deepened their ability to trench road surfaces efficiently, backfill in one pass, reduce downtime and environmental impact.

Now, PPS has added a second TCi 730 Street Trencher to their fleet. This isn’t just an expansion, it’s a strategic move that reflects a deeper insight: once you bring one of these machines into your operation, you realize the productivity gains and decide that one isn’t enough.

Why Two Makes Sense

  • Scalability & Flexibility: With two trenchers, PPS can run concurrent projects, reduce scheduling conflicts, and respond more quickly to client demands.

  • Efficiency Gains: These machines simplify the trenching process—they pulverize the material, trench below grade, and backfill in one streamlined operation. That translates to less manual labor, less disruption, and faster project completion.

  • Competitive Edge: In a market where turnaround times, accuracy, and safety matter, having dual units strengthens PPS’s ability to deliver on those fronts.

  • “Addictive” Performance: Once you see what a Street Trencher can do, it changes your view of what is possible on site. The first one proves the value; the second one doubles it.

A Culture of Innovation & Safety

Since its founding in 2002, PPS has built its reputation on consistent performance, cutting-edge methods, and an unwavering commitment to safety. The company understands that equipment investment is not just about getting the job done, it’s about getting it done better, smarter, and with less risk. The addition of the second TCi 730 Street Trencher underscores that mindset.

Strategic Partnership

At Street Works, we’re honored that PPS chose not only one, but two TCi 730 Street Trenchers from us. Our team remains committed to supporting their mission, delivering equipment, training, and service to ensure each machine performs at its best. Together, we’re redefining what utility access and trenching operations can look like.

Looking Ahead

With their fleet now expanded, PPS is poised for even greater productivity, improved lead-times, and enhanced service for their utility clients. Their investment sends a message: when you believe in your tools and your team, you don’t settle for “good enough.” You aim for best-in-class.

Street Works thanks the PPS team for their trust and for choosing us as their equipment partner. We look forward to seeing these machines in action and supporting PPS as they continue to raise the bar.

POSTED: October 22, 2025